Ishikawa + FMEA + Gantt + 8D – linked
Write a cause once in the fishbone. Tick FMEA and the same cause appears in the FMEA table. Actions from FMEA go straight into the Gantt plan and the 8D report. Change anything in one place – it changes everywhere. Everything stays on your device – nothing is uploaded.
Every FMEA row (and every 8D root cause) with an action appears here automatically, marked FMEA or 8D; 8D containment actions are marked D3. Action text, owner and due date are the same data as in FMEA – change them here or there. Add your own tasks for other work (meetings, reports, trials).
Add rows with + Add FMEA row (or tick FMEA next to a cause in Ishikawa). Each row can have its own item, function, failure mode, effect and S. Grey text = empty field, the value from the top of the page is used. Choose a category (6M) to show the cause in the fishbone. ⧉ copies a row (same item, function, effect, S, failure mode) for the next cause; ✕ deletes, − removes from FMEA only. Status, owner and due date are shared with Gantt and 8D. AP follows the AIAG-VDA (2019) table – please check it against your handbook; RPN = S×O×D for reference only.
The 8D report reuses what you already entered: the problem (top of the page), causes (Ishikawa), actions, owners and due dates (FMEA / Gantt). Fill in only what is new. Tick Root cause in D4 and use 5 Why to go deeper.
Where is your work saved?
Pick one method. You can switch any time – nothing is lost when you switch. A working copy is always kept in this browser too.
Copies and tools
A copy is a separate .json file: good as a backup or to send the project to a colleague. Opening a copy replaces the current project.
What this tool does
It combines four quality tools that are normally kept in separate spreadsheets: an Ishikawa (fishbone) diagram, an FMEA, a Gantt chart for the actions and an 8D report. They share one set of data, so every cause, action, owner and due date is typed only once. You can use all four together, or just the one you need.
Ishikawa diagram
Write the problem in the fish head and the possible causes on the six bones: Man, Machine, Method, Material, Measurement and Environment. Tick FMEA next to a cause to analyse its risk. Download the diagram as a PNG picture.
FMEA with Action Priority
The table follows the AIAG-VDA form: structure and function, failure analysis (effect, severity, failure mode, cause), risk analysis (prevention and detection controls, occurrence, detection) and optimization (actions, revised S, O, D). The Action Priority (AP) High / Medium / Low is calculated with the AIAG-VDA 2019 table; RPN is shown for reference. Rows can be copied for the next cause, exported to CSV for Excel and imported back.
Gantt chart
Every recommended action from the FMEA or the 8D appears automatically as a bar with its owner, start, due date and progress. Late actions turn red, finished ones green, and a red line marks today.
8D report
The 8D (eight disciplines) report reuses the problem, causes and actions you already entered. Add the team, containment actions and the 5 Why chain for each root cause, then print the report or save it as a PDF with the diagram and plan included.
Your data stays on your device
Nothing is uploaded. Work is saved automatically in your browser, and in Chrome or Edge on a computer you can link a project file (for example in a Google Drive or OneDrive folder) that is saved on every change. You can also download a copy as a file and open it later on another computer or phone.