Gantt Chart

Plan tasks by days or by hours: owner, start, end and progress. Late tasks turn red, done tasks green. Everything stays on your device – nothing is uploaded.

Add tasks below. Give each a start and an end date; add times if you plan by hours. A task with only one date is shown as a milestone (◆). Type a Duration like 7d 3h 20m and the end is calculated; choose After to start a task when another one ends. Rows stay in your order – drag them by ⠿ or use ↑ ↓. A group row holds the tasks below it, until the next group. Your plan is saved in this browser – use Save / Open to keep a copy.

Calendar:
Plan time zone: All times you type are in this zone. Add From / To places with their zones to see local times there (e.g. arrival in Vladivostok).
View: Zoom: Ctrl + mouse wheel = zoom · Shift + wheel or drag an empty part = move · click a task name = zoom to it
Drag grid: Drag the middle of a bar to move it, its ends to change start or end. On a phone: hold the bar, then drag.
Examples:

Add rows with + Add FMEA row (or tick FMEA next to a cause in Ishikawa). Each row can have its own item, function, failure mode, effect and S. Grey text = empty field, the value from the top of the page is used. Choose a category (6M) to show the cause in the fishbone. ⧉ copies a row (same item, function, effect, S, failure mode) for the next cause; ✕ deletes, − removes from FMEA only. Status, owner and due date are shared with Gantt and 8D. AP follows the AIAG-VDA (2019) table – please check it against your handbook; RPN = S×O×D for reference only.

The 8D report reuses what you already entered: the problem (top of the page), causes (Ishikawa), actions, owners and due dates (FMEA / Gantt). Fill in only what is new. Tick Root cause in D4 and use 5 Why to go deeper.

In the print window choose “Save as PDF” to get a PDF file.

Where is your work saved?

Pick one method. You can switch any time – nothing is lost when you switch. A working copy is always kept in this browser too.

Copies and tools

A copy is a separate .json file: good as a backup or to send the project to a colleague. Opening a copy replaces the current project.

How to make a Gantt chart

Press + Add task, write the task name and the owner, then choose the start and end dates. For work planned by the hour (a changeover, a shutdown, an event) also enter the start and end times. Set the progress as the work moves on.

Zoom: from months down to seconds

Fit all shows the whole plan. Zoom in with + or Ctrl + mouse wheel, move with ◀ ▶, Shift + wheel or by dragging an empty part of the chart. Click a task name to zoom straight to it – handy when a three-month task and tasks of a few hours are in the same plan. The labels switch between days, hours, minutes and seconds as you zoom. Short tasks always stay visible and show their duration. Weekends are shaded and a red line shows today or the current time.

Drag and drop

Drag the middle of a bar to move a task, or its ends to change the start or the end. Bars jump in steps of the drag grid you choose – for example 1 day, 2 hours, 15 minutes or 5 seconds. Ctrl+Z or Undo takes back a change. On a phone, hold the bar for a moment, then drag.

Durations and linked tasks

Write the duration as 7d 3h 20m (w = weeks, d = days, h = hours, m = minutes, s = seconds) and the end time is calculated from the start. Choose After to start a task exactly when another one ends – for example the legs of a truck trip or the steps of a changeover. When a task moves, every task after it moves too. Arrows show the links.

Groups, order and working days

Arrange the rows in any order: drag them by the ⠿ handle or use the ↑ ↓ buttons. Add a group (for example “Design”, “Tooling”, “Validation”): every task below it belongs to it, until the next group. The group shows one summary bar from its first start to its last end, with the average progress, and can be closed with ▸ to keep big plans readable.

Turn on Working days only to skip Saturdays, Sundays and the holiday dates you list. Then 5d means five working days: a task of 5 days starting on a Friday ends on Thursday. Hours and minutes in a duration stay clock time.

Critical path and slack

The critical path is the chain of tasks that decides when the whole plan ends: if any of them is late, the end moves too. These tasks are outlined in pink, with pink arrows between them. Every other task shows its slack – how much it may be late without moving the end: in the table under its name, and on the chart as a grey dashed line after its bar. The path follows the After links and the groups; with working days on, weekends and holidays do not count as slack.

Time zones and local arrival times

Choose the plan time zone – the clock of all the times you type (for example the dispatcher's office). For each task you can add a From and a To place with their time zones; the page shows the local departure and arrival time there. Example: leaving Kyiv at 08:00 for 7d 3h 20m arrives in Vladivostok at 19:20 local time. City zones such as Europe/Kyiv or Asia/Vladivostok include summer time automatically; fixed zones such as GMT+2 do not change.

Colors

Blue bars are planned work, the darker part is the progress. A task that should already be finished turns red, a task at 100 % turns green. A task with only one date or time is a milestone (◆).

Save, share and export

The plan is saved automatically in your browser. Download a copy as a file to keep it or send it to a colleague, or in Chrome or Edge on a computer link a file (for example in Google Drive) that is saved on every change. Download the chart as a PNG picture or the task list as CSV for Excel.